Villarodin-Bourget / Modane site
Home | Construction sites | Villarodin-Bourget / Modane site
DECLINE | 4 KM | WORK COMPLETED
It is located on the right bank of the River Arc and is 4,036 metres long. It is subdivided into two sections: a first section of approximately 1000 metres with a 1% slope and a second section parallel to the future base tunnel with a 12% down gradient.
Progress

The construction site was open from 2002 to 2007 employing approximately 290 workers, 40% of whom were from the Rhône Alpes region. The main excavation technique was the traditional one, using explosives. Once the base tunnel becomes operational, the decline will serve as a ventilation shaft, and as a maintenance and safety passage.

Transformation of the excavation materials
This decline has enabled the testing of the transformation of inert excavation materials for concrete aggregate by constructing an experimental treatment plant on the same site, equipped with the most modern grinding and production methods. 143,000 tons of materials, representative of the materials to be excavated from the base tunnel have been processed. The aggregates obtained were used in shotcrete or stocked for subsequent concrete tests.
Dati chiave

4.036 m of length

290 direct workers

12% slope

2002-2007 duration of the worksite
News from the sites

10.5 km of France-side base tunnel completed
With the 10.5 km base tunnel completed on time and on budget TELT presents Mission-S, the programme to improve safety at work.

Axel arrives in Chiomonte
The CIM 4.0 competence centre has created for Webuild the first autonomously-guided robot to safely explore the deepest area of the gallery.

The multimodal interchange hub in Saint-Jean-de Maurienne will become operational in mid-June
Above ground and underground works are in progress in France and Italy.

A new major construction site for the Lyon-Turin base tunnel
Mission-S: TELT and companies sign pact for accident prevention and workers’ health